Difference between revisions of "Local Politics:Issues:Construction Costs"
Line 41: | Line 41: | ||
* Boston Globe: [https://secure.pqarchiver.com/boston-sub/doc/405125684.html?FMT=FT&FMTS=ABS:FT&type=current&date=Aug+20%2C+2008&author=David+G.Tuerck%3B+Tuerck+is+executive+director+Beacon+Hill+Institute%3B+professor+of+economics+at+Suffolk+University.&pub=Boston+Globe&edition=&startpage=&desc=Next+target%3A+the+prevailing+wage+law Next target: the prevailing wage law], by David G.Tuerck (Aug 20, 2008) | * Boston Globe: [https://secure.pqarchiver.com/boston-sub/doc/405125684.html?FMT=FT&FMTS=ABS:FT&type=current&date=Aug+20%2C+2008&author=David+G.Tuerck%3B+Tuerck+is+executive+director+Beacon+Hill+Institute%3B+professor+of+economics+at+Suffolk+University.&pub=Boston+Globe&edition=&startpage=&desc=Next+target%3A+the+prevailing+wage+law Next target: the prevailing wage law], by David G.Tuerck (Aug 20, 2008) | ||
* Boston Globe: [https://secure.pqarchiver.com/boston-sub/doc/294460689.html?FMT=FT&FMTS=ABS:FT&type=current&date=Aug+26%2C+1988&author=Butterfield%2C+Bruce&pub=Boston+Globe+%28pre-1997+Fulltext%29&edition=&startpage=&desc=REPORT+RELEASED+ON+PREVAILING+WAGE Report released on prevailing wage], by Bruce Butterfield (Aug 26, 1988) | * Boston Globe: [https://secure.pqarchiver.com/boston-sub/doc/294460689.html?FMT=FT&FMTS=ABS:FT&type=current&date=Aug+26%2C+1988&author=Butterfield%2C+Bruce&pub=Boston+Globe+%28pre-1997+Fulltext%29&edition=&startpage=&desc=REPORT+RELEASED+ON+PREVAILING+WAGE Report released on prevailing wage], by Bruce Butterfield (Aug 26, 1988) | ||
* Boston Globe: [https://secure.pqarchiver.com/boston-sub/doc/294407717.html?FMT=FT&FMTS=ABS:FT&type=current&date=Jun+12%2C+1988&author=Butterfield%2C+Bruce&pub=Boston+Globe+%28pre-1997+Fulltext%29&edition=&startpage=&desc=PREVAILING+WAGE+FACES+TOUGH+TEST Prevailing wage faces tough test], by Bruce Butterfield (Jun 12, 1988) | |||
Revision as of 23:01, 13 April 2014
The question we are posing here is why government building construction costs, at the town and state level (for schools, police and fire stations, community centers, city halls, state college buildings etc), are much higher than those incurred by private real estate developers (for office buildings, manufacturing facilities, shopping malls, private schools, private college buildings etc).
Government Building Construction
Vynebrooke Village Renovations
In 2014, Annual Town Meeting approved in its Article 8 (g) renovations at Vynebrooke Village, at the cost of $300k to Lexington and $600k to the Dept of Housing and Community Development. Work scope: replacing 27,000 sq ft of siding, 17,000 sq ft shingle roof, and 24 doors[1][2].
Estabrook Construction
The Estabrook school construction has a 56,252 sq ft gross floor area[3], and the construction cost was $41M[4]. This comes comes to $728 per sq ft.
Lexington High School Modulars
The High School Modulars are 24,525 sq ft gross floor area[5] at an estimated construction cost of $6.7M-$7.7M[5], including an unspecified amount of technology equipment. This comes to $273-$313 per sq ft.
Private Real Estate Developers Construction
Hobbs Brook Construction in Waltham
Hobbs Brook announced in the fall of 2013 that it is planning to construct an office space building in Waltham, at 275 Wyman St, for 315,000 sq ft at $100M construction costs[6]. This comes to $317 per sq ft. Vistaprint will move its headquarters from Lexington into the new building once it is completed.
Lexington Documents and Data
Estabrook
- Estabrook Educational Program
- Estabrook Project Meetings
- Estabrook Space Summary 11-10-19
- Estabrook Work Plan Schedule 11-09-16
- 11-10-13 SPL-Option 1 - 3 Story School
- 11-10-13 SPL-Option 2 - 3 Story School
- 11-10-13 SPL-Option 3 - 2 Story School
- 11-10-13 SPL-Phased Construction
LHS Modulars
- Lexington Minuteman: Town Meeting approves Lexington High School modular classrooms, by Marc Filippino (Nov 7, 2013)
- LHS Overcrowding, School Committee update, (Sept 10, 2013)
Massachusetts Documents and Data
- Project Labor Agreements and Financing Public School Construction in Massachusetts, by David G. Tuerck and Paul Bachman. Beacon Hill Institute, Dec 2006.
- Project Labor Agreements’ Effect on School Construction Costs in Massachusetts, by Dale Belman, Russell Ormiston, Richard Kelso, William Schriver and Kenneth A. Frank
- Wikipidia's Project Labor Agreement page.
News & OpEds
- Boston Globe: Next target: the prevailing wage law, by David G.Tuerck (Aug 20, 2008)
- Boston Globe: Report released on prevailing wage, by Bruce Butterfield (Aug 26, 1988)
- Boston Globe: Prevailing wage faces tough test, by Bruce Butterfield (Jun 12, 1988)
Notes
- ↑ Apr 7, 2014 Town Meeting session, min. 70.
- ↑ lex-tmma thread: Financial impact of reconsideration of article 10L (Apr 2014)
- ↑ See Estabrook Space Summary 11-10-19 for Estabrook floor area data
- ↑ Lexington Minuteman: Costs rise for Estabrook School building project, by Ben Aaronson (Oct 16, 2012)
- ↑ 5.0 5.1 LHS Overcrowding, School Committee update, (Sept 10, 2013)
- ↑ Boston.com: Developers propose $100m, 315,000 square foot Vistaprint building in Waltham, by Jaclyn Reiss (Nov 5, 2013)